2025-06-06  our T2 is now fully installed. Electric and water. New airco, Boiler (80ltr.) ,induction plate, sun awning. We also put new grid on the level 3

2025-05-11  Today our T2 mobile home arrived. It is now on his place on level 3. We will connect the toilet and shower and will place a 80 ltr boiler. Also we will replace gas for induction kooking. We will also place an airco. 

2025-05-01  We did a lot of working the last days.  But still fun to do.

No power, so kooking on the BBQ

Painting the flower bucket

Helping with painting

Cleaning our new energyroom

Painting the energyroom

Repainting the wooden house

No, Molly is not helping

2025-04-29   New grid on level 2,    two new filtering pools for the borehole water.

2025-04-20    Added page >  Racing rules of sailing 

Added page >  The  Latest News