march 2026 we will get our second T2 with terras on 17 april 2026
This mobile home will come on level 2 with view to our pool. Also will there be airco, boiler, induction plate. installed/
Available for long term rent.
jan 2026 our boot tent was in bad condition, so we decided to put a aluminium roof on it and we will later close the sides.
okt 2025 we made a new roof on our old tent frame. The cover we had was just blow off. Hopefully is this more stable
2025-06-06 our T2 is now fully installed. Electric and water. New airco, Boiler (80ltr.) ,induction plate, sun awning. We also put new grid on the level 3
2025-05-11 Today our T2 mobile home arrived. It is now on his place on level 3. We will connect the toilet and shower and will place a 80 ltr boiler. Also we will replace gas for induction kooking. We will also place an airco.
2025-05-01 We did a lot of working the last days. But still fun to do.
2025-04-29 New grid on level 2, two new filtering pools for the borehole water.
2025-04-20 Added page > Racing rules of sailing
Added page > The Latest News