2025-06-06 our T2 is now fully installed. Electric and water. New airco, Boiler (80ltr.) ,induction plate, sun awning. We also put new grid on the level 3
2025-05-11 Today our T2 mobile home arrived. It is now on his place on level 3. We will connect the toilet and shower and will place a 80 ltr boiler. Also we will replace gas for induction kooking. We will also place an airco.
2025-05-01 We did a lot of working the last days. But still fun to do.
2025-04-29 New grid on level 2, two new filtering pools for the borehole water.
2025-04-20 Added page > Racing rules of sailing
Added page > The Latest News